SITE HISTORY
BAF was built to fabricate the Hibernia Offshore Oil Project, constructed here in the 90s.
The Gravity-Based Structure (GBS) platform stands 224m high, which is half the height of New York’s Empire State Building at 449m tall. Fabrication of the 5,800-tonne wellhead module as well as topside component integration, hook-up and commissioning all took place at Bull Arm Fabrication.